Ahafo Roads Project
As part of the environmental permitting requirements for the Ahafo Mine, NGGL is required to provide an improved transport link between the main Asutifi District towns of Kenyasi and Ntotroso. NGGL has examined various options, including upgrading the existing Ntotroso-Kenyasi (N-K) Road, and building a new road section to bypass the active mining areas (Subika Bypass Road (SBR), as well as Ntotroso Bypass Road (NBR). This road improvement shall be designed to meet Ghana Highway requirements.
Daov Tech Design Group was commissioned to undertake the project.
The scope of services provided by Daov Tech included the following:
• Detailed Engineering Design
• Preparation of Design Drawings
• Drainage Design
• Estimation of Quantities
• Soils and Materials Investigation
• Preparation of Project Reports
• Preparation of Bidding and Contracting Documents