Mining

our commissions in the mining sector ad the lorem ipsum dooea ek



  • Western Diversion Road ( Adausena Road )
  • Ahafo Roads Project
  • Ahafo Roads Project

    As part of the environmental permitting requirements for the Ahafo Mine, NGGL is required to provide an improved transport link between the main Asutifi District towns of Kenyasi and Ntotroso. NGGL has examined various options, including upgrading the existing Ntotroso-Kenyasi (N-K) Road, and building a new road section to bypass the active mining areas (Subika Bypass Road (SBR), as well as Ntotroso Bypass Road (NBR). This road improvement shall be designed to meet Ghana Highway requirements.

     

    Daov Tech Design Group was commissioned to undertake the project.

    The scope of services provided by Daov Tech included the following:

    • Detailed Engineering Design
    • Preparation of Design Drawings
    • Drainage Design
    • Estimation of Quantities
    • Soils and Materials Investigation
    • Preparation of Project Reports
    • Preparation of Bidding and Contracting Documents

    Diversity

    As part of our business strategy to diversify, DaovTech Design Group working in collaboration with our foreign partners retails a variety of Engineering Equipment particularly in the area of Surveying. Please refer to our products shop.

    Contact


    Send Feedback!

    Your feedback and or comments are important to us. Please fill out the form below and we will revert as quiclky as possible.

    Email:
    hello@daovtech.net
    Phone:
    +233 (0) 302 258168
    Twitter:
    @Daovtech